Premise Cable Production Line

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2018-03-07 06:58

  • Browse the number:

    332

Send an inquiries
Company Profile
Dongguan Hongrong Electrical Machinery Co.,Ltd
Contactaixin:

hongrong(Mr.)  

Email:

telephone:

phone:

Arrea:

Beijing

Address:

#229 Mingzhu Road, Shatian Town, Dongguan City, Guangzhou Province, China

Website:

http://www.china-ofcmachine.com/ http://www.shanjiastone.com/com/hongrong/

Product details

Application: premise cable sheathing line apply to make simplex, duplex and distribution cable which has 2~24 fibers, cable coating material can be PVC, LSZH.


Main feature:

Distribution cable production line easy to operate, The equipment adopts industrial computer and programmable logic control (that is IPC+PLC mode) to realize the line's synchronal running and the independent operation. The production operation and the parameter set and display are carried out through the industrial computer. The production state collection and progress control are realized on PLC. The computer communicates with PLC, which can realize the production operation, the warning display, the line's emergency and other functions.


Optical cable to make:

Premise cable production line:

Diameter of tight buffer

Φ0.6mm,Φ0.9mm

Diameter of premise cable

Φ6.5mm (12 fibers)

Φ8.2mm(24 fibers)

Line speed

≤120m/min(single core, pvc)

60m/min (12 cores, pvc)

Size of tight buffer reel

Φ400mm*Φ56*300

Size of optical fiber reel

25km or 50km reel for fiber

Tight buffer pay-off tension

0.4N~1.5N (adjustable)

Optical fiber tension

0.4~1.2N(adjustable)

Stranding angle

0~±6π

Stranding Pitch

80~400mm

Aramid cops no.

12cops

Aramid pay-off tension

0.6N~3N

Extruder type

SJ50/65 ×25

Take-up tension

5N~20N(Multi-fibers)

3N~10N(simplex and duplex cable)

Size of take-up reel

PN1250mm

PN630mm

Line length

Approximately 34 m

Power requirement

50Kw

Line operation direction

appointed by consumer

Line color

appointed by consumer

Line center height

1000mm

Overall dimension

34m*3m*3m


Distribution cable jacketing line elevation

Our Service:
1. Cable making equipment delivery on time.
2. Cable making machine commissioning: when machine completed, the commissioning shall be conducted in our factory with buyer examination. The materials for the commissioning shall be supplied by the seller.
3. Cable machine installation: If the buyer wants the support to install our machine in his/her factory, all expenses our workers spend will be borne by the buyer, the expenses include round flight tickets, costs for visa, fees for local hotel, meals and transport in buyer's country). Salary USD 60 for one person each day.
4. Guarantee period: The guarantee period is one year after cable equipment commissioning. During guarantee period, the seller shall be responsible for the replacement of any spare parts for free due to the quality problem, the buyer shall be responsible for the air courier or transmission fee of the spare parts.


Our cooperated company:

India: Thermal Cable, UDEY INSTRUMENTS, SAGAR SWITCHGEARS LIMITED, etc.

Bangladesh: Heaven Cable etc.

Russia: Pribor-Systems Ltd., CZKSK Co.,Ltd etc.

Ukraine: PJSC «ODESKABEL» etc.

Turkey: Korel Elektronik San. ve Tic. A.S etc.

Belarus: Guangzhou Rose import & Export Co.,Ltd.

Iran: Shahrekord Setayesh Engineering & Trading Co. etc.

Zimbabwe: CAFCA Limited

Egypt: Nile For Cables And Electrical Industries etc.

North Korea: the only one optical cable company.

China: BYD Co., Ltd, Hubei Aerospace Cable Co.,Ltd, SZKST Cable Co.,Ltd etc.


http://www.china-ofcmachine.com/